Mitchelmore Engineering Company (Meco) was contracted by the Department of Natural Resources (DNR), Government of Nova Scotia, to perform a Dam Safety Review (DSR) and flod innundation studie at Long Lake dam.
The Long Lake dam is a homogeneous earthfill dam originally constructed in the mid 19th century. It has a low level sluice and overflow spillway for flood control.
Meco’s Services include:
-
Classification of the dam and spillway in accordance with CDA Guidelines
-
Site inspection for physical deficiencies
-
Review and analysis of design and construction
-
Hydrotechnical analysis and development of inflow design flood (IDF)
-
Flood modeling using FLDWAV software
-
Innudation mapping
-
Slope stability assessment
-
Review of compliance with previous reports
-
Preparation of a Dam Safety Review Report
|
Other Dam Safety Management Projects
Other Projects
|