Meco (Mitchelmore Engineering Company) was contracted by Newfoundland Power (NFP) to perform Dam Safety Reviews (DSR’s) at the Tors Cove / Rocky Pond and Cape Broyle / Horse Chops Hydroelectric Developments. NFP has an annual DSR program in accordance with the Canadian Dam Association (CDA) Dam Safety Guidelines, 1999 for hydraulic structures that it manages.
NFP’s 2003 DSR program included eight (8) embankment dams, five (5) concrete spillway structures for review.
Meco’s Services include:
-
Classification of each dam in accordance with the CDA guidelines
-
A site inspection for physical deficiencies
-
An analysis of Design and Construction
-
A review of Operations, Maintenance and Surveillance
-
A review of NFP’s Emergency Preparedness
-
A review of Compliance with Previous Reports
-
Documentation and Preparation of a Project DSR Report
|
Other Dam Safety Management Projects
Other Projects
|